Warlock operator app

Product doctrine

Accept the bounty before the art unlocks

Operators see enough to judge the work, cost, location, and support. Full Murals.ng art/design assets stay locked until acceptance.

Warlocks is the Murals.ng implementation control center. Bounties are the work units.

Visible before acceptance

  • Bounty type: hand-painted mural installation
  • General location: Ikoyi, Lagos
  • Installation window: 3 days after acceptance
  • Compensation: NGN 35K/sqm estimate + covered transport
  • High-level scope: interior brand mural
  • BOQ: Warlock to submit material list before purchase

Locked protected assets

  • Full art files
  • Protected design assets
  • Detailed client/project materials
  • Internal Murals.ng notes

Compensation + earnings

Offer

NGN 35K/sqm labour estimate + transport covered

Accrued

NGN 0

Pending approval

NGN 420K

Available withdrawal

NGN 0

Withdrawn

NGN 0

After acceptance: execution guide

01

Full brief intake after acceptance

Locked until acceptance

Process

  1. 1. Review full design/render/spec.
  2. 2. Confirm target installation address and site contact.
  3. 3. Acknowledge compensation, covered expenses, and BOQ responsibility.
  4. 4. Flag missing details before dispatch.

Outputs

  • Brief acknowledged
  • Location/access confirmed
  • Missing-information flags

02

Site arrival + surface verification

Warlock-determined

Process

  1. 1. Arrive at target location and identify exact mural surface.
  2. 2. Measure usable width and height.
  3. 3. Calculate estimated square metres.
  4. 4. Capture surface, angles, close-ups, obstructions, and measurement proof.

Outputs

  • wall_width_m
  • wall_height_m
  • estimated_area_sqm
  • readiness recommendation

03

BOQ + execution plan

Requires go/no-go

Process

  1. 1. Compare design to measured surface.
  2. 2. List paints, primer, sealant, tools, access support, and assistants.
  3. 3. Confirm who buys/provides materials.
  4. 4. Get go/no-go before painting.

Outputs

  • Bill of quantities
  • Material/procurement plan
  • Execution plan
  • Go/no-go decision

04

Procurement + surface preparation

Execution prep

Process

  1. 1. Buy or collect approved materials.
  2. 2. Upload receipts and material photos.
  3. 3. Clean, tape, prime, protect floor/furniture, and mark layout/grid/reference points.

Outputs

  • Material receipts
  • Material photos
  • Before-wall photos
  • Prep photos

05

Mural installation

Paint approved design

Process

  1. 1. Paint strictly according to Murals.ng design/spec.
  2. 2. Do not change composition, colours, text, scale, or finish without approval.
  3. 3. Upload progress photos at checkpoints.
  4. 4. Use bounty thread for questions or approvals.

Outputs

  • Progress photos
  • Escalation notes
  • Completed mural ready for final proof

06

Final proof + manual review

Completion gate

Process

  1. 1. Clean the work area.
  2. 2. Capture final front photo, angles, close-ups, context photos, and short video.
  3. 3. Submit operator notes, material usage, issues, and final proof package.
  4. 4. Wait for Femi/manual reviewer approval.

Outputs

  • Final proof package
  • Reviewer decision
  • Client-ready receipt
  • Earnings ledger entry