Implementation control center

Product doctrine

Warlocks admin

Femi and Accelerator use this surface to package, offer, monitor, approve, and pay for real-world Murals.ng implementation work.

Warlocks is the Murals.ng implementation control center. Bounties are the work units.

Active bounties

1

MVP test workflow

Needs review

1

Manual approval required

Payment exposure

NGN 420K

Labour + covered expenses

Bounties requiring command attention

Selected bounty command file

WRL-2026-LAG-0001

Hand-painted mural installation

Install an approved Murals.ng design at the target location with protected art access only after acceptance, a bounty-specific thread, step-by-step execution guide, evidence submission, manual approval, and earnings ledger update.

Source input

Murals.ng / AI-agent implementation input

Target location

Private client wall, Ikoyi, Lagos

Offer state

Group offer ready: 3 recommended Warlocks

Asset state

Locked until bounty acceptance

Payment rule

Approved amount posts to Warlock earnings ledger only after manual review.

Matched Warlocks

Tunde A.

Lagos Island

92%

Strong hand-painted typography, close to site, mid cost profile

NGN 32K/sqm

Mira Studio

Yaba

86%

High finish quality, needs transport cover, premium cost profile

NGN 45K/sqm

Kola Paintworks

Surulere

81%

Reliable execution, fast availability, lower design-detail score

NGN 28K/sqm

Before acceptance: visible preview

  • Bounty type: hand-painted mural installation
  • General location: Ikoyi, Lagos
  • Installation window: 3 days after acceptance
  • Compensation: NGN 35K/sqm estimate + covered transport
  • High-level scope: interior brand mural
  • BOQ: Warlock to submit material list before purchase

Hidden until acceptance

  • Full art files
  • Protected design assets
  • Detailed client/project materials
  • Internal Murals.ng notes

Evidence checklist

  • Surface measurement proof
  • BOQ/material plan
  • Before-wall photos
  • Progress photos
  • Final front photo + angle shots
  • Short final video where useful
  • Operator completion notes

Bounty thread

Accelerator

Confirm site access window before offer is released.

System

Protected assets remain locked until acceptance.

Femi

Manual approval required before earnings are posted.

Step-by-step implementation guide

01

Full brief intake after acceptance

Locked until acceptance

02

Site arrival + surface verification

Warlock-determined

03

BOQ + execution plan

Requires go/no-go

04

Procurement + surface preparation

Execution prep

05

Mural installation

Paint approved design

06

Final proof + manual review

Completion gate